BTC Health and Safety Policy V6.0 Page 13 of 21 Dec 2023 APPENDIX A BRITISH TAEKWONDO COUNCIL ACCESS TO CLUB/DOJANG - CONTRACTORS All contractors are asked to note and respect the conditions for working in this building, ensuring the form at the foot of this page is completed at the start and end of the project. • Smoking, food and drink is strictly forbidden in all plant areas. • Access doors to/from plant rooms must remain secured and attended during deliveries. • Tools and equipment must not be left on site without permission. • Appropriate protective clothing must always be worn. • Access is strictly limited to specific/identified areas of work. • No additional works must be undertaken without authorised work orders. • Chemical stocks/containers must not be moved/handled by contractors. • Electrical supply must be isolated from machinery, etc, as appropriate. • Climbing and high-level works must use proper towers and equipment. • Hard hats, goggles, dust or mist masks, gloves, must be used appropriate to the job. • All accidents/ incidents must be reported to the instructor. • Any keys loaned must be returned to the instructors before leaving site. • Access to plant rooms must be accompanied/approved on every visit. • Health and Safety at Work legislation must be adhered to and practised throughout. • COSHH regulations always apply and must not be compromised. • Any chemicals or substances used must be approved and COSHH sheets supplied to the instructor. • The club/academy instructor reserves the right to refuse access and/or request that all works cease should there be any reasonable concerns or breach of regulations. • Contractors must complete the following on each visit/job: CONTRACTOR: WORK DESCRIPTION: DATE: TIME IN: TIME OUT: CONTRACTOR SIGNATURE: TELEPHONE: WORK COMPLETED: SIGNATURE:
RkJQdWJsaXNoZXIy NDkxNjM=